Hi there,
When I export the floor to RAM modeler if I have a super imposed load not over the column grid I need to put in the loading using coordinates. As shown below:
If I need to change this slab. I then need to re-export it and then put in the coordinates of the super imposed loads again. This, as you can imagine, is very tedious.
Is there a way to copy the super imposed loads between files? or sketch over them and then copy the sketch to the new file and trace that? and is there an easier way to do this?
Also, Is it possible to add a wall in the modeler by coordinate entry rather than have it snap to the grids?