Image may be NSFW.
Clik here to view.
Please Help.
As you can see in the figure,LOAD 500 includes both repeat load of generated vertical load and notional load.
The problem is the first notional load 2.25KN is loaded in the corbel not on the runaway girder (gantry).
How can I transfer this load to the beam not on the corbel because as i checked the coordinates of the generated load it seems correct?
Thanks a lot.
(Please visit the site to view this file)