When piles support a mat foundation in STAAD Foundation Advanced where are the top of the piles assumed to be located for flexural analysis and punching shear checks? Are they assumed to be at the base of the mat foundation? Most concrete piles are embedded 3 to 4 inches into the bottom of the pile cap/mat foundation. Can I account for this by having the design thickness = analysis thickness - 3 inches?
↧