I have two concrete beams in my model that are showing the correct loading in the beam load diagram report, but there is an almost non-existent shear and moment in the beam line force envelope report. It also does not appear to be loading the supporting beams correctly. Vague screenshot below attached for reference.
Does anybody have any ideas as to where the disconnect is occurring and how to fix this issue?