Ram concept - AS 3600.2009
Hi everyone,
When I first looked into load combination of AS.3600-2009 for prestressed concrete, the initial service load combo in Standard is 0.9SW + 1.15P, which is different from 0.8SW + 1.15P in Ramconcept manual.
Can anyone explained me why?