Can you pleas help with this one.
Im doing a time history load but I got an error " *WARNING* MASTER / SLAVE EQUATIONS ARE NOT PROPERLY CONSIDERED IN A TIME/STEADY SOLUTION."
Are my calculation wrong because i already sent this to these forum but when I make a calculation report this warning was discovered.
Do i need to redo my design and use offset command or there is a remedy to this.
Thank you.(Please visit the site to view this file)